Thanks for the encouragement guys. I've not had much time to make progress with it the past week, been busy getting my pack back together and working after an unfortunate mishap for a local convention, now that that's all sorted I can focus on this once more.

I plan on testing the mechanism for the microphones before mounting it inside the microphone housing (I'm making up part names as I go along, it just makes it easier). No sense in putting it in there and it being wrong. I think the biggest issue will be getting the gear ratio down so the movement is much slower. The motors I'm using are around 5-8 thousand RPM and I need to figure a way of greatly reducing that, otherwise my microphones will be a blur of movement. I'm thinking using a gearing system that will slow it down, reduce it down by having a series of small gears that connect with larger ones to reduce the number of turns. Ideally it needs to be 1 turn ever 2 seconds, looking at the footage of the gigameter in gb2, it takes a second for them to separate then another second to draw together again.

I've been looking into maybe a gearbox system, you can get them on ebay such as this one

http://www.ebay.co.uk/itm/TX45-2x-3v-5v ... 56621e00e2

I've a few little things I need to do before I can properly mount the scan head dome into the body. I still need to attach the heat sink and cut the hole in the main body under the battery box so that the batteries can fit neatly. Once I'm done with that, I can prime, paint and get the scan dome mounted :)

I'll update when I can do :) If anyone has any ideas regarding the microphone movement please let me know, any help is greatly appreciated
#4802658
This post may contain an affiliate link that helps support GBFans.com when you make a purchase at no additional cost to you.

Ben, thanks for the suggestion, I've had a look into it. If I was going to go down that route it would require more than just hooking up a pot to a motor, the voltage and current would have to be matched carefully to prevent the pot burning out . I'd need a speed regulator circuit, unfortunately, a lot of these circuits are geared towards motors with a larger volt supply and have pretty hefty heatsinks on them, I don't want to risk melting part of my shell from a heatsink getting too hot. I have found this kit which might do the job however

http://www.bakatronics.com/shop/item.aspx?itemid=383

The other thing I looked into was motors that spin at either 30 or 60rpm. Now I've looked carefully at the scenes where the microphones are moving and it's roughly 2 seconds for a completed cycle, thats from being together, to going apart to being together again. Now, if I had the drive spindle from the motor attached directly to the cogs for the the microphone movement then a 30rpm set up would be perfect. If I have it set up with an 3 cog resting against the two microphone cogs then I believe a 60rpm would be better. here's the two motors I've found, the only issue I think may be size.

http://www.ebay.co.uk/itm/Rectangle-3V- ... 1c398a95d9

http://www.ebay.co.uk/itm/3V-60RPM-Torq ... 4ab8744f13

Anyway, ON WITH THE UPDATE!

So after making the heatsink, I attached it to the body, made sure that it was positioned correctly for the dome. I then added the scan dome lip, a hoop around the opening for the dome, to the body. A pringles lid turned out to be the exact diameter and height I needed!

Image

I then drilled and shaped the holes for the switches on the main body.

Image

Image

After getting some tank tread, the same tank tread as used on the slimeblower, from a friend, I added the extra detail to the front of the handle

Image

At this point she was ready for priming!

Image

First coat of primer, I'm really quite happy how it's looking! There's a few things I need to tidy up still, but overall the main shell is done

Image

And here's the shell as it is now :)

Image
Kingpin, jackdoud liked this
#4803755
Hey guys, another update! Been crazy busy with work the past few weeks but I've managed to make some good progress with the gigameter.

Firstly, after looking at the new photo that's surfaced of Egon holding the gigameter, there's a noticeable lip between the top and lower portions of the shell. I had noticed that AZ Spidey had included this detail on his build and shells but it was missing on Cyland's build and very difficult to see if it was there on the screen grabs and in the film. I cut out the lip using styrene, wow, what a difference it makes. It really tidies up the shell and makes the lines that much crisper

Image

I suppose the biggest update would be that I fitted the LEDs into the microphones! This was far more fiddly than I anticipated. The 5mm LEDs were to big to just push up into the microphone head so I had to cut them off. I then threaded the ribbon cable through and soldered 3mm ultra bright orange LEDs in their place. Once all soldered and properly insulated with heat shrink tubing, it was just a matter of pushing them into position.

Image

As you can see, it's a bit of a rat's nest of wiring in there at the moment, it's going to be all tidied up before I finally close it up though :)

Image

And here's a video of it in action :D enjoy!

https://www.flickr.com/photos/62174436@N08/14809702811/
Smeghead, Kingpin, jackdoud liked this
#4804803
Okie Dokie, Time for an update!

And I have been mega busy!

First of all, now that the main shell is finished I decided to paint it, went with metallic black, has metallic flecks in the paint, the same as the PKE

Image

Image

I've also started afresh with the microphone housing, not complete yet but definitely coming along very nicely

Image

BUUUUUUUUUUT I suppose the biggest update would be....this :)

https://www.flickr.com/photos/62174436@N08/14900784433/

Since filming the video I've rearranged the gears and the noise is greatly reduced. My dad is going to bring me some grease to lubricate the gears, further reducing the noise. Let me tell you, getting the mechanism right was a real pain in the ass, very fiddly and precise.

So what's left to do? Well I have to finish off the microphone housing and fix the dome in place, a bit of painting but that's about it, it's probably going to be finished by next week :)
Dougger, jackdoud liked this
#4804866
Me and Simon have been collaboratively working on our gigameters. We've shared our ideas and concepts for the builds, electronics, functions etc. What information i've found I've shared with him and vice versa. A lot of going through what footage there is and stepping through it slowly to figure out which switches do what, how many lights in a sequence, that sort of thing. Simon hasn't begun his build yet, he has a shell but it needs a lot of tidying up. When he stars he will be using the same methods I've used in mine :)
#4804880
We were originally going to show both builds on one thread. Unfortunately after I started that post on the UKGB forum, the amount of tidying up on my shell was a lot worse than expected and then put on hold after I had to fork out a considerable amount of cash on my car.

Yes we've collaborated on it and the mechanism used will be the same, however the builds of each shell will be different.
#4825381
Been meaning to put some nice pics up of it on here, seeing as I'm snowed in and off work, I thought why not :cool:

Image

Image

Image

Image

Image

Image

Image

Image

Image

And a little side by side comparison with the PKE meter. You can see it's not much bigger in length, the camera and angle in the film really do make it look so much more larger. Weight wise, it's slightly heavier than the Matty PKE, but not by much.

Image

Image

Image
jackdoud, Kingpin liked this

If you check the post below from reddit, one of […]

got a link? It appears that some time today[…]

I love that. I actually think a better version of […]

Afterlife Ecto Goggles Build

Thank you for posting this information. This is a[…]